And this is the finished driveway and landing on the stairway beside it. Hopefully, it will all dry before any of our ever-radiant West Van matrons come along walking their pampered pooches in search of pooping places and peeing poles. And before some semi-conscious driver decides to use it to turn around in.... If it were me in charge of that job, I'd post one of my turbaned employees at the roadway with a well-oiled shotgun loaded with rock salt, or maybe buckshot.
Wednesday, October 7, 2009
Finishing off the concrete walks and driveway
Finally, the end seems to be approaching on this long, drawn-out construction project in the next block, over in West Vancouver, on 3rd Street just north of Keith Road. This was started over a year ago, by demolishing a one-storey rancher near the back of this large and mostly wooded lot. They then removed most of the trees, butchered a couple of the big ones left standing, and then brought in a big backhoe to dig up most of the lot and create the hole for the basement. That machine, incidentally, was operated by a gal with long dark hair, and a cute posterior, who made that thing practically dance. Since then, the rest of the job has been relatively slow going. Sometimes they've only worked on it about three days a week. Other times, people seemed to be swarming all over it. I just don't understand the construction business, I guess. But I'll be absolutely delighted when all the noises have subsided, and somebody actually starts living in this almost-hotel.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment